Project Professional

Available

Level - red new.png

SENIOR

OVERVIEW

QUALIFICATIONS

Project Management and Industrial background with 10+ years of experience in the Oil & Gas, Construction, and other sectors.

SKILLS AND STRENGTHS

EXPERIENCE

 NOTABLE PROJECTS

EDUCATION

COMPETENCIES 

Quality Assurance Lead

2021

-

2022

Wood plc

Manage onsite Quality Assurance program

Multi Discipline Inspections

Client and progress meetings

Project Manager

2021

-

2022

QED International Oil & Gas

- Successfully delivered the DED scope of the 12” x 30km Gbetiokun to Adagbassa Manifold Crude Export Pipeline Project by receiving milestone completion certificate and payments for the completion of each design revision gate.
- Served as project manager performing activities such as budget forecasting, project planning, scope development and Vendor management.
- Monitored project performance to cost and schedule, tracked milestones and deliverables, identified issues and developed corrective action plans for issues holding up project progress.
- Managed project communications including status reports to all stakeholders.

- Evaluated and analyzed the Basic Engineering Package provided by the Client with the Engineering team.
- Led the Engineering team on site visit to the Gbetiokun Early Production Facility for data gathering and verification.
- Ensured that deviations observed during the site visit with respect to the scope of work were captured, tracked and closed out using an Issues Register.
- Coordinated the generation and issuance of a FEED verification report from Engineering to the Client.
- Coordinated Geophysical and Topographical survey activities and report for use during Detailed Engineering Design.
- Monitored the issuance of RFQ packages to OEMs for long lead items and bulk items.

- Ensured inter-discipline workflow, coordination of design and resolution of inter-disciplinary conflicts.
- Identified, documented and managed scope, cost and schedule variations/change orders.
- Prepared and issued to the Client, variation proposal form and cost breakdown which captured additional scope of work.
- Successfully carried out design reviews, 3D model review, HAZOP and constructability study with the Client and industry regulators in attendance.
- Closed out the project’s MDR, with all deliverables issued as a dossier to the Client in the required number of copies and document formats.
- Issued a project close out report to the Client.

Project Cost Control Lead

2021

-

2022

Midwest Pipelines Inc.

Recruit and train staff

Set up systems and procedures

Employee time tracking, supplier and subcontractor tracking and processing. Billings and reporting.

Project Manager

2016

-

2022

Omega Mechanical

Collaborate with project stakeholders to identify scope, budget and schedule requirements while offering value engineering and design services to ensure progression through phase gates.

Develop and foster mutually beneficial relationships with clients and project partners such to identify and achieve shared goals.

Compile RFQ documentation and lead the procurement process for selecting project partners along with material and equipment while referencing specifications, budgets and schedule.

Napoleon Dynamite

2008

-

2022

High school

doin stuff

computer hacking, nunchucks

CFO

2019

-

2022

GravelHUB Marketing

Project Manager for website development

Product requirement backlog management

Mechanical/Electrical Coordinator

2021

-

2022

Synergy

SKILLS AND ABILITIES
Construction Coordinator Electrical Instrumentation (EI)/Mechanical:
• Involved in reviewing drawings and specifications, provided recommendations for changes required. Provided input during engineering design for construction and feasibility.
• Supported Project Engineers with preparation of construction work packages, scopes, bid reviews and material purchase. Created clear scope of work to outline contractor’s accountability and minimize overlap and redundancy. Reviewed RFP’s (request for Proposals) and RFQ’s (Request for Quotes) with the engineers and project managers.
• Managed construction activities and ensured they were executed properly and safely according to engineered documents and scope of work / contract.
• Planning developing work packages for maintenance and construction work activities and work fronts.
• Overseen all safety incidents and followed up with contractor(s) on reporting and completing incident reports. Made sure that all contractors are following their ERP (emergency response plan) when required. Follow all OH&S and OSHA regulations.
• Reported contractor status to team including identifying areas of concern in HSSE, quality, material, engineering documents, change management, schedule, progress, and other contractor and operations interfaces. Gained support of project team to proactively deal with areas of concern, assured contractors work fronts uninterrupted.
• Interfaced and actively managed proper communication with contractors to ensure work activities coordinated and executed smoothly and efficiently.
• Acted as main point of contact in field to support contractors and answer construction questions in communicating field direction. Coordinated requests for information (RFI) and gained alignment before contractor submission of RFI. For urgent responses, RFIs were escalated to project engineer or management for timely response.
• Completed and filled out variance forms for personal protective equipment (PPE) free zones, worksite parking, mobilization of equipment, and equipment inspection for onsite work. Proactively managed processes to ensure seamless transition and schedule alignment.
• Versed in contract terms and scope of work to support Construction Lead and Project Engineer in contractual clarifications and formal contractual communications with contractor.
• Managed interfaces between operations and construction activities including tie in, outages and pre-commissioning activities. Communicated between groups to make sure safe energization of new systems.
• Participated in formation of milestone schedules and planning. Monitored contractor schedules, provided weekly progress updates, and flagged any concerns regarding milestone dates. Provided input for schedule recovery and interface milestone to ensure tasks on schedule and on budget.
• Supported scheduler / planner with construction execution sequence. Contributed to lessons learned debrief to continually help to optimize construction activities, improve functionality and to push schedule ahead.
• Participated in front end contracting strategy planning and supported Project Engineer scopes of work definition, formation, and bidder evaluations. Reported site activities daily and flagged productivity and other contractual concerns to keep track of budget and schedule.
• Documented all changes / red lines and ensured turnover package was completed. Provided feedback on constructability and design improvements during and after construction activities for up-to-date drawings.
• Supported Project Manager and Project Engineers to develop construction execution plans for projects. Generated and shared ideas of constructability of product to reduce costs.
• Approved and accepted internal testing process (ITP) to support the QA / QC coordination of hold points and inspections. Specs were followed up to construction standards and CEC.
• Mobilized contractors on site by inspecting construction equipment and worker qualifications and confirmed before starting to work on site. Determined equipment was up-to-standard and was in mechanically good condition and completed spot checks for worker qualifications.
• Provided construction coordination support to other coordinators for all disciplines, clearly communicated status and work direction when passing along responsibilities.
• Perform weekly safety audits of construction sites and document issues and get resolution to documented issues.
• Coordinated and worked closely with health safety security and environment (HSSE) and Quality Assurance departments. Acted as first point of contact for incidents to communicate with environmental team to determine a path forward to minimize environmental impact.
• Monitored and proactively managed company supplied materials for contractors to ensure contractor’s scheduled material requirements were met and material issues mitigated to workflow issues ensuring no schedule delays.

Electrical and Maintenance Supervision:
• Troubleshot, repaired, and replaced electrical systems. Identified problems with programming as well as with starters and cabling to restore service and function of equipment quickly and safely.
• Over 15+ years as an industrial maintenance electrician in the potash/mining industry.
• Install 600v MCC (Motor control centers) familiar with E300 plus and associated starters.
• Led and supervised a team of 34 electricians, provided guidance and coaching on performance expectations. Ensured progress of projects was on schedule and on budget.
• Planned work scopes for electrical projects, ordering material, tracking.
• Determined valid credentials valid, reviewed experience and knowledge and made recommendations for hiring.
• Experienced and knowledgeable with electrical blueprint reading for industrial and construction projects. Interpreted prints during construction phase followed code and building standards.
• Oversaw high voltage installations from 25KV – 230KV and ensured proper equipment installed according to Canadian Electrical codes and standards.
• Commissioned all electrical equipment onsite including motor control centers, pumps, instrumentation, Gas Insulated Switchgear (GIS), and lights running according to specifications.
• Power switching 5KV-230KV, planning and executing switching plans.
Millwright:
• Rebuilt and installed motors, gear drives, pumps, fabrication, hydraulics, pneumatics, and repairs. Troubleshot mechanical equipment to assess malfunctioning and restore to working condition.
Welding:
• Fabricated motor and pump stands and safety equipment by using plasma cutting, mig, tig, and oxyacetylene. Often worked without blueprints to design and build equipment to work safely and properly.

Operations Manager/Controller

2021

-

2022

McIntosh Sand & Gravel

Coordinate plant planning

Financial planning and forecasting

Spare parts, fuel, etc admin and planning

COO

2019

-

2022

Peter Lucas Project Management

Everything required of me

Product Manager

2022

-

2022

Peter Lucas Project Management

Bench 2.0

Support leadership team

Project Information Management Specialist

2016

-

2022

BHP

Developing and adhering to project information management principals, processes and systems

Using, storing, classifying, assessing and processing data/metadata in alignment with company standards and requirements for data quality management, integrity and governance

Engaging and managing a range of diverse internal and external stakeholders

Project Engineer

2019

-

2022

Halliburton Latin America

Comprehensive Project Coordination, from the design of the pumping system to the safe and reliable delivery to the client.

Ensure that projects have feasible activities and actions, setting real deadlines that meet scheduled timelines, budgets, and design specifications

Work with team members to ensure unwavering compliance with safety requirements.

No competencies found. Please complete your competency assessment through your dashboard.

Unskilled

Familiar

Skilled

Expert

Daily Monitoring

Document Management

Scope Management

Schedule Management

Cost Control

Risk Management

Product Quality

Project Quality

Estimation and Bidding

Requirements Gathering

System and Process Analysis

Test Case Development

Emotional Intelligence

Leadership Styles

Innovation Support

Change Management

Conflict Resolution

Coaching and Mentorship

Accountability

Meeting Faciliation

Motivation Techniques

Professional Collaboration

Personal Evaluations

Diversity and Inclusion

Oral Communication

Written Communication

Safety Management

Business and Financial Acumen

Procurement

Contractor Management

Process Improvement

Project Technology and Software

Planning

Prioritization

Human Resourcing

Strategic and Results Orientation

Environmental Expertise

No competencies found. Please complete your competency assessment in your dashboard to view results.

Engineering Project Lead

Start

In support of government’s desire to increase supply of domestic gas (DOMGAS) to local industries and power plants, SPDC submitted a plan to government in October 2008 detailing out steps to increase its contribution to the DOMGAS market between 2008 and 2013; divided into short-term and medium-term supply targets. The short-term covers a period of 2008 – 2010 and includes refurbishment/expansion of existing plants and completion of on-going projects in selected locations (referred as gas hubs), and AGG nodes. This is aimed at increasing supply to circa 1.3bscfd supply target from the current 900MMscfd supply rate. The medium-term plan from 2011 – 2013 is aimed at further capacity expansion at the identified gas hubs with wellstream supply from immediate and remote fields to achieve a supply target of circa 2bscfd.

USD 550M

$

USD 550M

Project Manager

Start

Newcross Exploration and Production Limited (NewcrossEP), on behalf of its joint venture partners Nigerian National Petroleum Corporation (NNPC), Nigerian Agip Oil Company (NAOC), Shell Petroleum Development Company (SPDC) and Total E&P plan to build and operate a Crude Storage and Handling Terminal with De-Watering (Liquid Treatment Facility) and Re-injection facilities at OML 024. With a Storage Terminal, the Project shall enable Company meet its business objectives of maximizing production uptime during periods of vandalization or leaks occurring in the Nembe Creek Trunk Line (NCTL), while with a ‘De-watering and Produced Water Re-injection Plant, Company will realize its objective of a reduced Operating Expenditure (OPEX) by eliminating or reducing to the barest minimum, Crude Transport and Handling costs, given a massive reduction in gross liquids transported and handled at Bonny Crude Oil Terminal (BCOT) or others.

USD 3.35M

$

USD 3.35M

Project Manager

Start

The OML-40 (NPDC/Elcrest JV) Asset located in the Niger Delta comprise of Opuama, Gbetiokun, Abiala, Adagbassa and Tsekelewu fields. The Asset is currently producing from the Opuama field following series of field developmental activities which has increased production to about 30,000bopd. In line with NNPC and NPDC/Elcrest JV drive to ramp up crude oil production, development of Gbetiokun field proven to have high hydrocarbon potential is currently ongoing. The activities commenced with Gbetiokun-1 and 3 completions and drilling of Two (2) new (Gbetiokun 4 & 5) wells with current Oil production circa 11,000bopd. At full field development, it is projected that volumes would increase to about 45,000bopd. This will bring the total crude oil production in OML 40 to about 80,000bopd. Permanent crude oil evacuation from the Gbetiokun field is planned to be through a 12” x 30km pipeline running from Gbetiokun production facilities to Adagbassa Manifold where it will tie into the 16” x 36km Opuama- Otumara export pipeline, as against the current crude oil barging operations with its attendant cost and safety risks implications. The pipeline is expected to have a design life of about 25 years, buried at minimum of about 4.5m depth with a design pressure of 100barg. The services required generally consist of the review of all Front-End Engineering Design (FEED) necessary for the successful completion of the Detailed Engineering Design, Procurement, Construction and Installation for Gbetiokun to Adagbassa Manifold Crude Oil Delivery Line in OML-40.

USD 2.2M

$

USD 2.2M

Project Controls Manager

Start

Building Dyke for 418 Pit. Building Decline to mine A194 underground. Feasibility for Pit A34.

$374M

$

$374M

Finance Manager

Start

Restart of Myra falls mine which had been moth-balled for two years. Refurbishing plant, pumping out underground and refurbishing underground infrastructure. Sourcing underground Equipment.

$100M

$

$100M

Cost Lead/Finance Manager

Start

Section 2 of TMEP from Edmonton to Jasper Park

$1.2 BIllion

$

$1.2 BIllion

Project Manager

Start

Installation of 25 km of 4 and 6 in. flow line.

2 MM USD

$

2 MM USD

Project Manager

Start

I provided Design-Assist, Cost Savings, Revit, Construction and Project Management services to Stemcell for their existing facility.

11,000,000

$

11,000,000

Project Manager

Start

I provided Design-Assist, Cost Savings, Construction and Project Management services to TRIUMF for their IAMI capital project.

12,000,000

$

12,000,000

Project Manager

Start

I provided Design-Assist, Construction and Project Management services to the City of Port Coquitlam for their new recreation complex.

15,000,000

$

15,000,000

Materials Technician - Consultant

Start

I provided earthwork services for the expansion of Cenovus Energy's Christina Lake operations.

$

Materials Technician - Consultant

Start

I provided earthwork services to CNRL for the construction of their new Kirby North Plant project.

$

Loading...