top of page
peter-lucas-newpm white.png

THE BENCH

THE BENCH

THE BENCH?

|

CANDIDATE

A5750

See their updated profile

Saraswata Gupta

Asset 3.png
Asset 3.png

Saskatoon

Level - Yellow.png

Intermediate

Project Manager/Controller

Overview:

Mechanical background with 15 years in industrial projects

Personality:

Champion

Introvert

Extravert

58

Sensing

Intuitive

54

Feeling

Thinking

37

Judging

Perceiving

50

Dynamic

Assertive

79

Qualifications:

    Degree in Mechanical Engineering
    15 Years Industry Experience

Key Skills:

    Project Management
    Team Oversight
    Optimization
    Controls

We stand behind our people.

Senior Project Manager

2019

-

2021

Paharpur Cooling Towers Limited

-

Managed the EPC greenfield execution for Cooling towers, order value of 10 M USD, with a team of 30 engineers, technicians

-

Managed the EPC for brownfield execution of 1 M USD for Cooling Tower for Indian Oil Corporation Limited

-

Responsible for concept, design freeze, baseline freezing in PRIMAVERA project plan estimating, purchasing, installation, start-up, pre-commissioning &commissioning, training, till closure

Senior Project Manager

2017

-

2019

Honeywell Automation India Limited

-

Forecasting on equipment, labour and resources, manhour of resources in line to budget accurately to management consistently helping in procurement and contracting costs including the project estimate at completion

-

Interfaced with site accounting , vendors, contractors, achieving a synergy with positive cash flow as required and to reconcile project costs and commitments with the financial control system

-

Realization of all claims, change orders, release of Bonds and guarantees

Project Manager

2008

-

2017

GE Power /Alstom Power

-

Lead the development and progress of the engineering schedule and supporting the interface with the procurement and construction schedule

-

Hands on Experience/training in SAP with SAP implementation for PMS

-

Made World-class EPC capabilities internally within team that enable power producers such as TNB Janamanjung to deliver on both their power and environmental commitments within a very dynamic industry

Project Engineer

2003

-

2008

ThyssenKrupp Industries, KHD Humboldt Wedag

-

Responsible for the successful closure Design Engineering, Process Engineering support for Cement plant

-

Worked in close coordination with manufacturing, Production Planning and Controlling, factory for ensuring quality driven products is supplied

-

Fulfilled responsibilities for sizing of different fly ash handling equipment as per collection of Ash, right from Specification release by freezing back-to-back conditions, negotiating in technical discussion till accepted and further commissioning of the System with contractor

peter-lucas-newpm-whitesq.png

904 - 201 21st St E

Saskatoon, SK S7K 0B8

+1.306.954.8550

  • Facebook
  • Twitter

(c) 2022 BY PETER LUCAS PROJECT MANAGEMENT INC.

bottom of page