top of page
peter-lucas-newpm white.png

THE BENCH

THE BENCH

THE BENCH?

|

CANDIDATE

D4136

See their updated profile

Muhammad Mehmood P.Eng, PMP

Asset 3.png
Asset 3.png

Saskatoon

Level - Yellow.png

Senior

Senior Project Manager

Overview:

Mechanical background with 25 years in project management, engineering, and construction management

Personality:

Inventor

Introvert

Extravert

43

Sensing

Intuitive

44

Feeling

Thinking

51

Judging

Perceiving

51

Dynamic

Assertive

58

Qualifications:

    25 Years' Experience
    Project Management Professional
    Professional Engineer
    Masters of Mechanical Engineering

Key Skills:

    Project Management
    Potash Mining
    Underground Operations/Maintenance

We stand behind our people.

Project Manager/Construction Manager

2018

-

2022

SaskPower

-

Carbon Capture Project Manager

-

Overseeing construction activities of 9,000 sf pre-engineered chemical storage building

-

Developed and implemented a tracking, monitoring and reporting system for managing sub-contractors in terms of progress, invoicing, reconciliation, contingency and relevant manpower variances

Regional Planning Lead

2016

-

2018

SNC Lavalin

-

Underground Gas Facilities and Building Complex project

-

Responsible for System Interface between P6/PammS/CCMS for Onshore Maintain Potential Program

-

Developed Resource loaded EPC schedule having more than 12,000 activities for Unconventional Gas Facility

Project Controls Specialist/Scheduler

2011

-

2015

Flour Canada, Cameco

-

Professionally monitor the performance of the Midlite Electrical Contractor (Supply and construct 72kv transmission line including overhead fiber optic cable and messenger wire) under LEM Contract. Identified activities that are lagging and ask clarification and recovery plan

-

Reviewed progress and key commodity curves by each CWA. Involved in constructability review and value engineering session with sub-contractors. In addition, verified that key commodities as determined by the client shall also be loaded in the schedule

-

Lead Scheduler on MRX Program and responsible for the alignment and standardization of Hatch project controls plans with Cameco Corporate standards

Mechanical Scheduling Engineer

2007

-

2011

March Consulting Associates Inc

-

At PCS Allan, involved in bid evaluation process and initiated/responded to and followed up on RFI's to finalize the design phase

-

Reviewed the scope of work, client requirements, division of responsibility, project objectives and constraints to develop the strategy for effective project execution with project team during planning stage

-

Identified major activities to be performed for the project and the preferred sequence in which they are to be accomplished