top of page
peter-lucas-newpm white.png

THE BENCH

THE BENCH

THE BENCH?

|

CANDIDATE

N2194

See their updated profile

Yvette Mullen, P.Eng, PMP

Asset 3.png
Asset 3.png

Saskatoon

Level - Yellow.png

Senior

Project Manager/Engineer

Overview:

Field Project Engineer and manager with 17 years in mining

Personality:

Commander

Introvert

Extravert

75

Sensing

Intuitive

72

Feeling

Thinking

72

Judging

Perceiving

43

Dynamic

Assertive

85

Qualifications:

    Bachelor's in Mechanical Engineering
    Project Management Professional
    Professional Engineer
    17 Years Industry Experience

Key Skills:

    Mine/Mill Operations
    Project Management
    Project Coordination
    Leadership

We stand behind our people.

Project Manager

2019

-

2021

AECOM

-

Developed assessment strategy for Asset Integrity evaluation of retired gold mill equipment, condition was assessed to determine most cost- effective option for refurbishment or replacement equipment

-

Worked with vendors of existing equipment in a gold processing circuit to obtain budgetary pricing for equipment identified for replacement and parts for equipment to be refurbished to support development of a Class 3 estimate

-

Developed procurement strategy involving selection of vendors, guidance of junior resources in development of procurement packages, shop drawing reviews, and prioritization of vendor deliveries to meet construction schedule

Manager Engineering and Essential Services

2018

-

2019

Tata Steel Minerals Canada

-

Staffed and developed an effective team for the newly created department Engineering and Essential Services, covering operations and maintenance of lifeline equipment, warehouse, engineering, and camp facilities, incorporating existing employees and hiring new staff

-

Established remediation/planning strategy for diesel generator main power supply to the new Concentrator facility

-

Managed teams supporting the asset integrity of mine site lifeline systems (power, potable/well water and sewage), establishing a reliability execution plan

Mill Engineering Supervisor

2016

-

2018

Orano Canada Inc

-

Transformed Orono’s Change Control system including development of Commissioning Management Plan to improve the workflow, accuracy, and efficiency of the process, reducing the costs and execution times for changes

-

Executed Orano’s Mill Engineering 2016 and 2017 annual 15-million-dollar Capital Project Portfolios; projects were executed safely, on time, and within budget

-

Interfaced with operations, maintenance, and external contractors to successfully plan, coordinate, and execute the 2016 three-week maintenance shutdown on time, within budget, and with no safety incidents

Process Engineer, Manager

2001

-

2016

Worley Parsons, Tetratech, Rio Tinto

-

Seconded to AREVA’s McClean Lake site to support commissioning activities for the new Solvent Extraction facility.

-

Scope of the new Solvent Extraction facility included as part of JEB Mill Upgrade at AREVA Resources Canada Inc., McLean Lake Mill

-

Responsible to provide design support for a new potash mine development located in the southwestern US

peter-lucas-newpm-whitesq.png

904 - 201 21st St E

Saskatoon, SK S7K 0B8

+1.306.954.8550

  • Facebook
  • Twitter

(c) 2022 BY PETER LUCAS PROJECT MANAGEMENT INC.

bottom of page