top of page
peter-lucas-newpm white.png

THE BENCH

THE BENCH

THE BENCH?

|

CANDIDATE

N9335

See their updated profile

Steve Thomson

Asset 3.png
Asset 3.png

Okotoks

Level - Yellow.png

Senior

Project Controls Manager

Overview:

BSc. in Physics with over 25 years of capital project execution including enterprise platform implementation

Personality:

Performer

Introvert

Extravert

62

Sensing

Intuitive

45

Feeling

Thinking

38

Judging

Perceiving

65

Dynamic

Assertive

76

Qualifications:

    25+ years industry experience
    Physics Degree

Key Skills:

    Capital Project Execution SME
    Project Services Management
    Project Management
    Owner and EPC

Joint Venture overall manager from my time between 2009 - 2016

We stand behind our people.

Project Controls Manager

2021

-

2021

Kinross Gold Corp.

-

Managing a team of Project Controls professionals for the Phase 2 Expansion of the Tasiast Gold Mine in Mauritania that are responsible for controlling all contractor cost, forecasts, progress, scheduling, change management and estimates.

-

Utilize my extensive Capital Projects, Project Management, Engineering, Supply Chain, Construction, Commissioning and Operations experience to help construction management, finance and site operations teams identify and remove roadblocks to make informed and realistic decisions

-

Contractor management

Digital Integration Manager

2018

-

2020

Accenture

-

EPCM Project Management, Project Controls, Project Services Subject Matter Expert (SME) for Accenture Engineering Industry X.0 Capital Projects

-

Project Manager for design, test and delivery of a Safety and Productivity Solution (SPS) with technology selection, including design and installation of a full wi-fi network in a complex space, complete with full ready for operations and turnover playbook for a major O&G producer

-

Project Manager in implementing Hexagon Smart Materials solution for a major EPC

Overall Project Controls Manager / Asset Lead

2009

-

2016

Vista Projects Ltd.

-

Successfully managed all project controls functions on a joint venture pertaining to the EPCM of Cenovus’ Foster Creek F/G/H and the Christina Lake F/G phases of the $1.4B Central Processing Facilities for their Thermal Heavy Oil Expansions, including their Zero Base Module design

-

Managed and mentored a multidiscipline team of around 22 leads, estimators, schedulers, analysts and project accountants.

-

Responsible for integrating our entire existing project controls database and reporting structure with an off the shelf version of EcoSys, which included re-facilitating how the product interacted with Primavera and also how it did its versioning methodology while also changing how it looked at many different project controls calculations. (EcoSys has since taken some of this information and implemented it into their off-the-shelf product.)

Various

1993

-

2021

Various

-

Capital Project Execution (Conceptual Design through to Start-up and Commissioning/Operations

-

Project Management/Project Controls Management

-

Plant Operations

peter-lucas-newpm-whitesq.png

904 - 201 21st St E

Saskatoon, SK S7K 0B8

+1.306.954.8550

  • Facebook
  • Twitter

(c) 2022 BY PETER LUCAS PROJECT MANAGEMENT INC.

bottom of page