top of page
peter-lucas-newpm white.png

THE BENCH

THE BENCH

THE BENCH?

|

CANDIDATE

R2214

See their updated profile

Diane Taylor

Asset 3.png
Asset 3.png

Saskatoon

Level - Yellow.png

Senior

Project Planner/Scheduler

Overview:

Experienced Planner/Scheduler with 15 Years in Mining and Energy

Personality:

Advocate

Introvert

Extravert

18

Sensing

Intuitive

60

Feeling

Thinking

7

Judging

Perceiving

46

Dynamic

Assertive

35

Qualifications:

    15 Years' Experience

Key Skills:

    Primavera P6 Expert
    Governance, Analysis, Evaluation
    Turnaround Scheduling
    Earned Value Management

We stand behind our people.

Primavera Project Scheduler

2021

-

2022

Graham Industrial Services

-

Created new templates, reports, daily, weekly and monthly spreadsheets in preparation for Project Controls submissions as part of a new time and materials contract.

-

Submitted LEMs for the Graham project; updated and modified the Primavera project schedule with weekly progress; maintained, updated and progressed schedule for submission in the Weekly Report; monitored the daily schedule progress; modified existing reports to allow for night shift tracking, liaised with the joint venture staff at Jansen, maintained log sheets in Excel, tracked quantities and costs of purchases and expenses, on-site equipment costs; assisting with 3-week lookahead schedules, forecasted camp requirements and various ad-hoc requests.

-

Planner/Scheduler

2018

-

2020

Peter Lucas Project Management

-

Successfully completed 2 shutdowns utilizing an integrated work order/Primavera scheduling approach with accurate schedule updates and weekly progress reports for Management.

-

Assisted in establishing a network Primavera enterprise system.

-

Mentored the new Maintenance scheduler in Primavera.

Planner/Scheduler

2003

-

2018

BHP (2003-2008 & 2010-2018)

-

Developed meaningful schedules for the construction phases of the Panda and Koala underground expansion phases. Helped determine manpower loading, safety requirements / interaction requirements between contractors, ensuring adequate and safe job delineation due to highly congested work fronts.

-

Spearheaded the migration of the Primavera network to a new environment and a significant upgrade from Version 8 to Version 16.2 by working closely with IT and Primavera network users and carrying out extensive testing, ensuring the migration went smoothly and successfully.

-

Developed the Jansen port option pre-feasibility study schedule from inception to gating into the next phase, working with the EPC contractor and consultants, as well as owners' team, confirming all required activities were completed successfully. Helped to develop governance/assurance requirements for BHP-approved schedules, achieving audit requirements needed to progress to next study phase.

Planner/Scheduler

2008

-

2010

AMEC

-

Working on the Cory potash mine expansion, I developed and maintained the engineering and procurement phase schedule.

-

Mentored the junior construction scheduler to develop a relevant, well-developed construction schedule, ensuring appropriate resource monitoring and earned value.

-

peter-lucas-newpm-whitesq.png

904 - 201 21st St E

Saskatoon, SK S7K 0B8

+1.306.954.8550

  • Facebook
  • Twitter

(c) 2022 BY PETER LUCAS PROJECT MANAGEMENT INC.

bottom of page