top of page
peter-lucas-newpm white.png

THE BENCH

THE BENCH

THE BENCH?

|

CANDIDATE

R3991

See their updated profile

Justin Kajner

Asset 3.png
Asset 3.png

Saskatoon

Level - Yellow.png

Junior

Junior Project Manager

Overview:

Engineer-in-Training with 1 year in Mining

Personality:

Introvert

Extravert

51

Sensing

Intuitive

43

Feeling

Thinking

52

Judging

Perceiving

45

Dynamic

Assertive

56

Qualifications:

    Managing construction activities
    Quarterly forecasting and budgeting
    Knowledge of change management processes
    Progress reporting

Key Skills:

    Stakeholder communication
    Field inspections
    Project coordination
    Daily reporting

We stand behind our people.

Construction Coordinator, Cote Gold Mine

2021

-

2022

WOOD PLC

-

Manage issues affecting job progress. Ensure home office and procurement provide timely information and deliverables (equipment and materials) to optimize our construction schedule and budget

-

Coordinate planning and scheduling with the site contractors and procurement to adjust for sequencing issues or delays in equipment deliveries due to COVID-19 and other issues

-

Interpret technical drawings, schematics, and engineering standards to troubleshoot problems and manage Requests for Information (RFI), Field Change Requests (FCR), Field Change Notices (FCN), and Non-Conformance Reports (NCR)

Summer Student – Field Operations, Bolney Thermal Facility

2018

-

2018

Husky Energy

-

Gathered and analyzed production data utilizing SCADA and PVR systems to monitor and record field production

-

Participated in the daily safety meetings and ensured safe work practices and adherence to company policies and procedures

-

Maintained daily logs and conducted data entry for operational activities and parameters

Field Summer Student – Fort St. John, BC

2017

-

2017

Progress Energy Canada Ltd.

-

Participated in well site inspections and related activities including water testing, pumping standing water offsite, and ensuring all required safety markings and signs were present

-

Assisted an experienced operator with turnaround activities for a Refrigeration Plant and Compressor Station. Activities included assisting the operator with his necessary unit inspections and maintenance logging. Supported the site access safety program by ensuring all contractors had the required information/permits, safety and training tickets prior to conducting site services

-

Daily maintenance and housekeeping activities for the plants and well locations

-

-

-

-

peter-lucas-newpm-whitesq.png

904 - 201 21st St E

Saskatoon, SK S7K 0B8

+1.306.954.8550

  • Facebook
  • Twitter

(c) 2022 BY PETER LUCAS PROJECT MANAGEMENT INC.

bottom of page