top of page
![](https://static.wixstatic.com/media/12480e_ea1ed5cf101c44a1adad4dac5a27acea~mv2.png/v1/fill/w_200,h_74,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/12480e_ea1ed5cf101c44a1adad4dac5a27acea~mv2.png)
CANDIDATE
E2281
See their updated profile
Shane van den Berghe, P.Eng
![Asset 3.png](https://static.wixstatic.com/media/986bc5_c6e0e5ed855640978286d0a0e6ed8e72~mv2.png/v1/fill/w_370,h_386,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/Asset%203.png)
![Asset 3.png](https://static.wixstatic.com/media/986bc5_e469d26352e24038bf054085af18c218~mv2.jpg/v1/fill/w_370,h_385,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/Asset%203.jpg)
Saskatoon
![Level - Yellow.png](https://static.wixstatic.com/media/986bc5_378ce6d1386248d9b9efa84998f8be3c~mv2.png/v1/fill/w_124,h_21,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/Level%20-%20Yellow.png)
Intermediate
Project Manager/Engineer
Overview:
Geological background with 7 years in mining
Qualifications:
- Professional Engineer
- 7 Years Mining Experience
- Geological Engineering Degree
-
Key Skills:
- Mining Experience
- Project Management
-
-
Project Engineer-in-Training
2017
-
2021
Western Urethane
-
Project management of Imbedded Fabric Roofing System installation for potash cold product storage including project budgeting and scheduling.
-
Safety monitoring and documentation.
-
Quality Assurance and Quality Control (QA/QC) of Imbedded Fabric Roofing System.
Mine Engineer-in-Training
2012
-
2015
Vanscoy Potash Operations
-
Provide geological and geotechnical field support to the operations and construction departments, including addressing ground safety hazards and providing recommendations for mine design and planning as well as active mining.
-
Installation and technical analysis of rock mechanics instrumentation to monitor ground movement.
-
Provide ventilation field support and troubleshooting.
Geotechnical /Geo-Environmental Intern
2010
-
2011
MDH Engineered Solutions Inc
-
Supervision and safety monitoring of contractors.
-
QA/QC of the soil-bentonite cut off wall construction.
-
Overhauled cut and fill drawings of the 11km working platform to minimize waste, as well as finalizing drawings for construction.
-
-
-
![peter-lucas-newpm-whitesq.png](https://static.wixstatic.com/media/ac26b7_f75c3b8751804d35ad934f837281894c~mv2.png/v1/fill/w_77,h_19,al_c,q_85,usm_0.66_1.00_0.01,blur_2,enc_auto/peter-lucas-newpm-whitesq.png)
904 - 201 21st St E
Saskatoon, SK S7K 0B8
+1.306.954.8550
(c) 2022 BY PETER LUCAS PROJECT MANAGEMENT INC.
bottom of page